The Challenge

Penske warehouse facility Christchurch

Penske New Zealand’s Christchurch facility required a complete technology fit-out to support the demands of a large-scale commercial warehouse and transport operation. The site needed a high-performance network infrastructure, reliable CCTV and wireless coverage throughout the building and yard, and an audio environment suited to a busy working environment — all delivered to a tight project schedule.

The Solution

Teltrac delivered a multi-system technology solution for Penske’s Christchurch site, combining a high-specification structured cabling backbone with fibre infrastructure to support CCTV and WiFi, and a site-wide background music system. The result was a fully integrated, future-ready facility ready to support Penske’s operations from day one.

Key Elements

  • CAT6a Systimax structured cabling solution providing a high-performance network backbone throughout the facility
  • Powered fibre solution supporting CCTV and WiFi systems across the site
  • Site-wide background music system installed throughout the facility

Why This Solution

  • CAT6a Systimax cabling delivers superior performance and headroom for future network demands, well suited to the high-throughput requirements of a commercial transport and logistics operation
  • A powered fibre solution provides a clean, reliable backbone for CCTV and wireless systems across large or complex building footprints where copper alone would not suffice
  • Combining cabling, CCTV, wireless, and audio under a single installation partner ensures all systems are properly integrated and commissioned together
  • A site-wide background music system improves the working environment and can be zoned and controlled to suit different areas of the facility

Installation

Completed in June 2017, Teltrac managed the full installation across the Penske Christchurch facility, coordinating the structured cabling, fibre, CCTV, wireless, and audio works as a single, integrated project. All systems were installed, tested, and commissioned ready for Penske to commence operations.

Outcome

Penske New Zealand’s Christchurch facility was delivered with a robust, fully integrated technology infrastructure supporting reliable connectivity, comprehensive security coverage, and a comfortable working environment. The CAT6a Systimax backbone and powered fibre solution ensure the site is well-positioned to support Penske’s operations and any future technology requirements for years to come.